Bauer Technologies wins specialist piling contract for London’s Dovetail Building

Bauer Technologies has commenced work on the Dovetail Building in London.
Bauer Technologies has commenced work on the Dovetail Building in London.

The specialist piling and geotechnical works package for The Dovetail Building in the City of London has been awarded to Bauer Technologies.

The striking new 24-storey mixed-use development represents a significant addition to London’s premium office and retail landscape. Commissioned by Deconstruct UK Ltd on behalf of client Brockton Everlast, the project features a three-level basement and high-specification tower structure designed to meet modern sustainability and performance standards.

Deep Foundations & Underground Infrastructure 2026

Bauer Technologies’ scope of work is being delivered in two distinct phases to facilitate archaeological investigations by the Museum of London Archaeology (MOLA). The first phase, – running from November 2025 to February 2026 – will involve the extraction of redundant piles and the installation of approximately two-thirds of the new secant wall.

The second phase, scheduled for June to September 2026, will focus on installing a front-of-wall cased CFA secant pile line along the party boundary, and completing the foundation and bearing piles, including temporary works for the tower cranes and gantry.

In keeping with Bauer Technologies’ strong commitment to sustainable construction, the project will incorporate a wide range of carbon-reducing initiatives. These include the use of low-carbon reinforcement steel, concrete incorporating blended cement, supplied from a local batching facility, and 100% HVO fuel for all site plant.

Bauer has also implemented waste-reduction measures to optimise material efficiency and minimise environmental impact throughout the project’s lifecycle.

John Theos, Bauer Technologies
John Theos, Bauer Technologies

Commenting on the award, Bauer Technologies’ managing director John Theos said: “We are delighted to be working once again with Deconstruct UK on such a high-profile London development.

“The Dovetail Building exemplifies the type of technically challenging, sustainability-driven project where Bauer’s experience in complex urban settings and commitment to innovation can make a real difference. It’s a showcase for how deep foundation solutions can be delivered responsibly, efficiently, and in harmony with the capital’s built environment.”

3rd DFUI_Special Size Banner_728 x 90

About GeoCon News 123 Articles
GeoCon News reports on the latest development in all things GEO (Geospatial, Geotechnical, Geothermal) and Construction Technology

Be the first to comment

Leave a Reply

Your email address will not be published.


*