Improving site access across streams and ditches

The new BCB culvert bridge with pile tubes.
The new BCB culvert bridge with pile tubes.

A new temporary culvert bridge, which will allow for faster infrastructure delivery whilst protecting the environment, has been launched by bridge specialist Beaver Bridges in conjunction with the Readypower Group.

On many UK infrastructure projects in rural areas, culverts cause delay while they are installed over streams and ditches to allow the installation of access roads. There is also the danger that, if they are carelessly installed, they can cause damage to the local ecology.

The Beaver Culvert Bridge (BCB) provides a smarter, environmentally friendly alternative to traditional methods. Designed to UK highway standards and capable of supporting SV80 loading (80-tonne heavy good vehicles with a maximum basic axle load of 12.5 tonnes), the BCB provides a robust temporary access solution for tracked excavators, heavy construction plant and other site traffic operating on major infrastructure projects.

The BCB’s innovative screw-pile foundation system can be installed to depths of up to 20 metres without disturbing the channel bed, significantly reducing environmental impact while simplifying the environmental consenting process. The bridge is also fully galvanised, providing a 50-year design life and the resilience to withstand temporary flood submergence.

Beaver Culvert Bridges are available in lengths from 1.5 to 3 metres.
Beaver Culvert Bridges are available in lengths from 1.5 to 3 metres.

Delivered as a fully integrated turnkey solution, with all design, manufacture and installation undertaken by Beaver’s specialist in-house team under full design liability, this single-source approach reduces project risk, streamlines delivery and provides clients with complete accountability from concept through to completion.

Available from UK stock for immediate deployment, the BCB enables contractors to establish temporary access quickly, helping to protect programme schedules and maintain momentum on critical infrastructure projects. By eliminating the need for in-channel working and reducing installation time, the system offers a safer, lower-risk and more environmentally responsible solution for crossing culverts and small watercourses.

As infrastructure programmes continue to place greater emphasis on programme certainty, safety and environmental stewardship, the BCB provides contractors with a proven temporary bridging solution that helps remove one of the most common causes of construction delay—safe and efficient access across watercourses.

2606 BANNER Bluebeam
Richard Hinckley, Beaver Bridges
Richard Hinckley, Beaver Bridges

Beaver Bridges business director Richard Hinckley commented: ‘’We are very excited to launch this innovative new product to the market. Its modular over-span design enables our specialist teams to complete a full ground-to-deck installation in a single day, working entirely from the bank with no in-channel intervention.

“This approach delivers a faster, lower-risk installation while minimising environmental impact, helping to keep projects on schedule and providing a safe, sustainable access solution over culverts.’

BCB culvert bridges can be hired for temporary use during project delievery or may be purchased for permanent installation.

About GeoCon News 159 Articles
GeoCon News reports on the latest development in all things GEO (Geospatial, Geotechnical, Geothermal) and Construction Technology

Be the first to comment

Leave a Reply

Your email address will not be published.


*